(English)
Tel: 86-18538591025
Email:sales1@leadcrete.com
Your position: Home > News > Product News
Grout mixer and pump for sale
date: 2021-05-06
Grout mixer and pump for sale is a complete set of equipment that combines a mud machine and a grout pump to perform efficient, low-consumption tasks and effectively reduce complex procedures and long-distance operations. The pulp maker performs high-speed pulping production and storage of materials such as cement slurries and pumps the slurries directly to construction connection points to complete uninterrupted grout and grout injections. Grout plant pumps with mixers are primarily used in the construction of roads, railroads, hydropower, construction, mines and other above-ground and underground projects. Quickly mix water, cement, sand, bentonite, fillers, clays, silicates and other media. The plunger grout pump is then used for grout / grout to provide waterproof plugging, tunnel lining, foundation and bedrock reinforcement, and gap filling functions. This series of grout pumps has the advantages of compact construction, high grout pressure, and wide range of applications.
 Grout mixer and pump for sale
Grout mixer and pump for sale can be used in the following applications:
Civil Engineering-Soil Nail, Kickback, Ground Anchor, High Pressure Magma
Structures-building repair, foundation reinforcement, foundation reinforcement, soil compaction and grout
Construction-Post tension, ceiling under board, top and board height
Ocean-Underwater Foundation, Dock, Crusher, Coastline Foundation
Mining-High pressure lock grout, tunnel lining, contact grout, waterproof, cable, lock bolt
Utilities-Environmental protection structures, waterproofing, dam foundations
Ground Engineering-Deep Well Casing, Surveillance Well, Closure and Abandonment
Grout mixer and pump for sale
Precautions when using the grout mixer and pump for sale:
1. When a grout plant with a mixer is in operation, grout workers must not leave the post without permission.
2. While operating the device, the operator must not put his or her hands or other objects in the traveling and protective parts.
3. The operator should check the equipment daily and change the grease on the equipment regularly. After each shift, make sure the equipment is working properly and the pipeline is unobstructed.
4. It is strictly forbidden to close the water valve during grouting to prevent clogging of equipment and pipelines]
5. Grout plant pumps with mixers need to be overhauled and maintained to ensure proper operation of electromechanical equipment. All equipment must be overhauled after each grout is complete.
6. If pulping workers are not allowed to enter the material processing storage tank, they will supervise the transportation equipment in time, load the material to make sure the slurry concentration is normal, and of the filter You need to make sure that the exit is normal.
7. You will need to contact the relevant department in time after a sudden power outage or water outage. After power is restored, the water purification pump cleans the pipeline so that it is not blocked before starting grout injection.
If you are interested in grout mixer and pump for sale, please contact us! Email: sales@leadcrete.com


Inquiry
Please feel free to submit your inquiry information to us. We will contact with you as soon as possible.
Name:
Country:
Email:*
Phone:
Inquiry:*